Thursday, April 23, 2015

Real is Only Halfway There

Hey Guys,


Here are a couple of lectures which you may find inspirational or at least interesting, the first is 'Real Is Only Halfway There' by Peter Cook. Which is themed largely on capturing the essence of a project through drawing,rendering etc. which is not necessarily the most 'real'. It's only an hour and a bit if you don't watch the questions.



Another lecture which may also be interesting especially in relation to our conversations about use of perspective today is the first lecture in this video. In it Cammy Brothers presents a potential future for the drawing which is more poetic, through looking a brief history of drawing for purposes beyond construction drawing. Her lecture only lasts 30mins or so, perfect for a lunchtime :).




Hope they are useful,

Andrew

Monday, April 20, 2015

First Board Work

Still some filler text in places which should be less blocky and keys to do, but otherwise the first vertical strip on the far left of the boards (see layout in previous post) is done:






Any comments appreciated,

Andrew.

Wednesday, April 8, 2015

Design Development

So I have been focusing on the design for the majority of my time. I am looking to tie it all up before.

I have made a series of changes, , I have decided to bite the bullet and hang the whole of the hangar roof from the pylons which were introduced at review 3. There is a point which needs more structure, at the point where the roof goes from pitched to flat, but that is unresolved, will probably make a little model of it to test it out.

This now means that the terminal buildings are separate structurally. However now I have removed the lattice girder structure from the terminals they are looking a little neglected (See the second image), so they are the next task.

I did some quick exports of where I am :


Overview of the hangar

Kerbside

One 'module' of the terminal structure

Basic section

Precedents I am looking at for the terminals, trying to create a sleek translucent aesthetic which sits underneath the hangar roof structure:







Any thoughts?

Andrew


Update: This is what my terminal buildings are shaping up like:

Terminal Progress



Other Progress 
Edit: Board Layout


Monday, March 30, 2015

Floor Plans

 Hi Sam,

Please see the attached floor plans as I said in my email to you, these are layout plans as I try and figure out how the building will be accessed and how it will sit on the site.


Ground Floor Plan
First Floor Plan

Second Floor Plan
Look forward to hearing from you,
Veena :)

Monday, December 22, 2014

Fletcher Demolition Progress



Hi Sam, 
Hope you're enjoying the xmas break. Just wanted to share these photos of Fletcher low rise and Fletcher Tower with you. You can see that in the low rise now they are well on their way with the demolition of it and you can really see the skeletal frame of the building. 

I hope to have a similar structure in my building too as I discussed with you in our last tutorial (May have to double up the RHS columns in the workshop spaces in order to make them work). 







I'm currently working on an environmental strategy for the building, I want to make use of the river alongside the site but as it's stagnant it's proving difficult so I think i need to look at other methods. In my tutorial with Rob Atherton, he mentioned I'd need mechanical ventilation in the workshops for the extraction etc. 

Anyway, just wanted to share these photos with you.

Have a nice Christmas! 

Veena :) 

Monday, December 8, 2014

Workshop 2 Thoughts

Hi Sam,

Just thought I would make a quick post to review the feedback I received from the workshop. Looking at my review sheet and my own recollection the key questions raised were:

  1. The tower element was not visually designed.
  2. The hangar element was not visually designed.
  3. Issues relating to the large elements (tower/hangar) in terms bulk and scale of in the context of a planning application, Tom also mentioned the issue of infrastructure briefly.
  4. Key sections through hangar an tower missing.
  5. The pod loading system was questioned, is it quicker? is it necessary? although I think that this was resolved when I finally got round to talking through the arrivals terminal. 
  6. How do the airships anchor to the building.
I'll comment on these now and attempt to address some of these for our meeting on Thursday, but for now to get the ball rolling

1,2,3 and 4
For the review I focused on the layout of my terminal rather than the tower and hangar elements, I suppose that I had been making sure I tried to get the bread and butter of this project functioning correctly before I started the hangar, tower and mechanical elements of the project. Although I had massed them out in model form and worked out the circulation of pods/ airship hangar entry etc. the form itself was not resolved at all.

Tom mentioned bulk and scale as an issue in the review, would it be fair to argue that because the nature of the project as one of the flagship terminals for a worldwide network that some leeway would be afforded on the bulk an scale of the project? This is the kind of exceptional project that would be given this kind of leeway for both its social and economic benefits it brings to the local area.

Finally Tom also mentioned the infrastructural issues this is something which I highlighted in my Town Plan, which highlighted both the connection of Farnborough to existing transport infrastructure as well as the flight path of incoming and outgoing aircraft at the existing aerodrome.

Site Plan, highlighting the local transport infrastructure.


5&6
I feel that the design of the pods and the mechanism by which they are circulated through both the hangar and the tower is the next step in the design of the project, I have avoided getting bogged down in the specifics of the mechanism up until now however I think that this is the element of the architecture which will give the project it's theater, with visible circulation of the pods and docking and disembarking of the airships.


Review 2 Board Layout
I have looked at the requirements for Review 2 and they say:

"APART FROM THE REPORT AND CD, THERE ARE NO REQUIRED OUTPUTS FOR REVIEW 2. STUDENTS CAN
PRESENT WHATEVER THEY WISH.
The outputs listed are suggested only, although some of them may be necessary for a successful outcome at Review 3.
They are therefore shown in grey text."

They are:

"recommended drawings
• A complete set of plans, elevations, and sections. At least the ground floor plan, one of the sections, and one of the
elevations, should be at 1:200. All drawings should show the relationship of the project to its immediate context.
• A location plan or location model, showing the surrounding context and the new building itself.
• At least two 3D views of the project (one internal and one external) depicting the life of the building, in its context
recommended models
(in addition to any location model as mentioned above): a model or models of the building, to any scale. Models must be
placed where the jury can see them. This model will be the most important item you present."

From this I have drawn up a board layout and I am currently working through some ideas in my head for the digital presentation which was beyond poor in the previous review, however i intend to utilise GIFs and use it to go through areas of my terminal at a larger scale. I think this is important to nail down early due to the large nature of my project fitting it all on the board in a cohesive manner is a challenge.



2 Projects I Aspire To
Just as a quick addition I though I would include some images from a couple of projects which I aspire for my own to resemble. Just to give you and idea of where I want to head, with large 3D's to give the overview, then breaking the project down into drawings of its individual parts.

Slow Fish Market








Frackpool





This week I just aim to finish my site model, sketch some proposals for the tower/ hangar elements, produce an outline proposal for the tower/pod mechanism and possibly begin modelling it.


Thanks,
Andrew



As an appendix I though I would attach some pages from my review:
Site Plan


Departures, arrivals and baggage circulation.

Section through departures terminal,
highlighting environmental approach.



Saturday, November 29, 2014

Tutorial 27/11

Hi Sam,

Apologies for not attending my tutorial on Thursday, I wasn't going to come in at all until I saw Tom's e-mail regarding technical tutorials and I felt no matter how ill I was I couldn't miss one of only two environmental tutorials we have this year, so I just bit the bullet and came in and then went straight home.


   Massing

First thing, I finished off my massing diagram sheet:

Massing Diagram of Initial Proposal


This is a three dimensional representation of my initial massing sketches which have developed from my feasibility, this has then been exploded to show each individual element of the design and its approximate size in sqm at this stage, which has been tweaked based upon the typical numbers calculated. In the bottom right is an un-exploded model which showing the massed proposal as a whole, showing how the departures terminal, docking tower and arrivals terminal wrap around the south east corner of the hangar.


  Layout

Based upon the massing diagrams above, I have began to work on breaking up these spaces at 1:200 on my wall. The design works on the principles of a linear transport terminal up until boarding. At this point it works on a similar principle to the 'Drive Through Airport' by Burro Design, whereby detachable pods circulate up the tower from the departures terminal to the docked airship. Simultaneously the arrivals pod is unloaded and circulated down the tower to the arrivals terminal where passengers disembark and baggage is unloaded. From there the pod is circulated to the  hangar, where maintenance/ re stocking/ other apron services occur.

********IMAGE OF 1:200 PLAN WITH SKETCHES UP ON THE WALL********

At the stage where I felt the space had been broken down enough I took this into CAD and have continued to work upon the specifics of the layout using both sketching at 1:200 and CAD in tandem. Once I am happy with the solution I move onto the stage of the linear approach to processing the passengers.

CAD plan in development, the 'Check-in' area (bottom left) has been developed
further than the 'Waiting and Retail' area (bottom right)


One precedent I have been thinking about a lot at the moment is the Eurostar terminal at St Pancras, which from my recollection is a very simple, pleasant and efficient terminal in my experience; which from what I can see should have the capacity to deal with a similar but higher passenger count than my proposed Airship Terminal (Airship Terminal = 12,500, Eurostar = approx 30 trains a day with 600 passengers makes a max load of 18,000 passengers a day.) I suppose although it is not particularly architecturally outstanding, my experience of the efficiency and ease of travel is something I am keen to emulate, this may be down the extremely short travel distances involved and similar to my idea for the pods has one combined 'Gate Lounge' for all of the platforms.


  Circulation Diagrams

************************ W.I.P***********************


  Site Model

This week I have also fully cut a site model which is at 1:2000 @A2 which is currently in a state of assembly, I hope to use this to display a massing model of my proposal and perhaps one further model which highlights the materiality of the different building components.


1p for scale


  Structural Strategies

Although I have not had my structural strategies tutorial yet I do have an overall idea for what should inform the material and overall structural strategies.  I see this terminal as a kind of flagship project which along with a select few other terminals and retro fitted docking stations would provide the airship with a springboard to become a staple part of the 21st century. With this in mind the building should reflect this, I envisage a kind of airship inspired high-tech. This would make the whole project  in program, aesthetic and its engagement with the process through the airship hangar a true celebration of the airship as a mode of transport. With the addition of the nature of embarking and disembarking proposing a method in which the airship can be brought up to date and begin to meet today's demands of a mode of transport.

This 'Airship Inspired High-Tech' would consist of a combination of lightweight frames, translucent skins and tension wires. But all this lightweight structure would need to be grounded into the site by some heavier architectural elements, perhaps the service spines?


  Environmental Strategies

As mentioned I had my 'Environmental Strategies' tutorial with Rob Atherton yesterday, we spoke about how the hangar would form a part of my ventilation strategy used as an outlet for cross ventilation as it is a sheltered but otherwise unconditioned space. We also looked at the potential use of the service spines as tool for a night cooling strategy if constructed out of masonry, which was my initial notion, based upon the aesthetics mentioned earlier.

We also talked about solar strategies but he seemed happy with the way the current design was progressing naturally with regards to this, with the overhanging roof and stepped nature of the southern facade. Rob also mentioned that the arrivals terminal may suffer from low sunlight in the morning as it is facing east, an although that is not too much of a problem it may be something worth taking into consideration in future.


  Board Layout

With all of the above in mind I have created a board layout which I will try my best to produce for next week.


Couple of notes: the two 1:200 plans are one plan of the whole building at terminal level perhaps with the ground level kerbside elements on tracing paper to place over the top? The environmental and structural precedent pages would provide simple sections of key parts of the building with the relevant structural and environmental strategies noted upon them.


I think that's it.

Andrew